Our first major UK development is planned in the Celtic Sea; initially planned at 98MW for phase one, the development will expand by 300MW added in phase two.

The AWC is able to cope with the deep water sea and consistently high wind speeds within the planned project area.

The soil conditions, which may be an issue for other technologies, are well-suited to the AWC’s single anchor design.


It is the AWC that makes this challenging project a cost-effective one.

Articulated Wind Column

The most cost-effective floating foundation with high local content for waters between 70 to 250m.